The Bus sits on a fairly damp part of the paddock so it was necessary to put a gravel road base down. After a year on the grass the bus had sunken into its wheel ruts and needed a bit of help from the tractor to move it. |
Hudson helped with the tractor work! |
We will leave the eastern side as grass so that we can create a garden later on. |
Here we have most of the top soil off ready for the gravel. |
There were a few soft patches under the topsoil so the aim was to direct water off either side of where the bus will sit. |
The first few loads on and getting spread out. Scalp gravel was put down under 40mm road base. |
1st April 2015 - bus is sitting on a solid base now. Next it will be chocked up onto concrete pads and levelled. |
1st May - Putting the concrete pads under the bus ready to jack it up level. |
Rob and I getting things in place ready to jack the back section up level. |
I hired a 10 tonne jack to do the job. This was slow going as it only lifted 10cm at a time so there was a lot of chocking and lifting going on!!!! Here I am using a 3 tonne trolley jack that was much faster but slightly under powered! I used Macrocarpa sleepers stacked up like Jenga blocks to sit the bus on. This worked well and the bus is stable and level now. |