2nd of July - Flue casing done, heater pumping, its time to move in!!!!! There is still a lot to do. But we've got a comfy bed and heat so we are in. |
3rd July - Starting to get visitors already! Nobbie chillin with Em. Temporary kitchen bench tops. No drawer fronts but it will be functional soon! |
More drawer fronts and stainless handles. Bench tops to come. This is sort of a hallway section but Hudsons room spills into this area with the curtain open. We didn't want to waste space having a separate hallway section walled off from the rooms. |
Hudsons cosy little room. |
7th July - Digging a line trench for the composting toilet. This leads to an absorption trench about 25m away from the bus and is a shallow grave sized trench with gravel, ag pipe and hessian cloth. The excess liquid from the toilet ends up here. |